A major airline manufacturer was developing a new passenger airline model and production was delayed due to production difficulties at a subcontractor. We were retained by the manufacturer to quantify the damage arising from the delay including costs escalations, cancelled contracts, production bottlenecks and lost sales opportunities. The matter settled.